I. INTRODUCTION
1. This Complaint arises under the Camp Lejeune Justice Act of 2022 (“CLJA”)1 and
is filed pursuant to the provisions of Section VI of the September 26, 2023, Case Management
Order No. 2 (ECF No. 23), for adoption by reference to individual CLJA actions and in conjunction
with the Court-approved Short Form Complaint.
2. Marine Corps Base Camp Lejeune (“Camp Lejeune”) is a military base operated
by the United States, located outside of Jacksonville, in Onslow County, North Carolina. The base
is located on the coast of the Atlantic Ocean, with approximately 11 miles of usable shoreline, and
occupying approximately 156,000 acres (244 square miles) in total. Camp Lejeune supports a
current population of approximately 170,000 people.
3. The story of Camp Lejeune has been described by scientists as the worst public
drinking water contamination crisis in our nation’s history.
4. At this point in time, it is undisputed and well-documented that, between at least
1953 and 1987, Camp Lejeune provided contaminated water to those on base. It is estimated that
1
Pub. L. No. 117–168, title VIII, § 804 (2022) (one section under the broader “Honoring our PACT Act of 2022”).
1
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 1 of 45
as many as one million people may have been exposed to this water, including service members,
civilian staff, and their respective families and dependents.
5. During this timeframe, contaminant levels in finished water—such as the water
coming out of taps in housing, buildings, elementary schools, and hospital wards—reached at least
280 times higher than what the Environmental Protection Agency (“EPA”) today considers safe.2
6. The list of diseases, illnesses, injuries, and conditions connected to the
contaminants in Camp Lejeune’s water supply is long and grave, including but not limited to:
leukemia, non-Hodgkin’s lymphoma, bladder cancer, kidney cancer, lung cancer, esophageal
cancer, breast cancer, Parkinson’s Disease, female infertility, miscarriages, and more. Many of
these diseases, illnesses, injuries, and conditions have been acknowledged by the United States as
causally connected to the contaminants at Camp Lejeune.3
7. The handling of this issue by the United States reveals a disregard for internal
military water quality standards, a failure to respond to the contamination, the ignoring of warnings
of the risk of contamination coupled with repeated test results showing that contamination was
present, and the withholding of information from even Defendant’s own scientists initially
investigating the crisis.
8. As a result, scientists attempting to identify the true scale of contamination were
misled for decades, resulting in a loss of contemporaneous investigatory ability, and requiring
water modeling to retroactively calculate contamination levels.
2
See William R. Levesque, Veterans Dep’t, St. Lawrence Cnty., Camp Lejeune Water Contamination History (Oct.
18, 2009), https://stlawco.org/Departments/Veterans/CampLejeuneWaterContaminationHistory (last visited Jun. 27,
2023).
3
See, e.g., Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention,
Dep’t of Health and Hum. Servs., ATSDR Assessment of the Evidence for the Drinking Water Contaminants at Camp
Lejeune and Specific Cancers and Other Diseases 13 (Jan. 13, 2017) (“ATSDR Evidence Assessment”), available at
https://www.atsdr.cdc.gov/sites/lejeune/docs/ATSDR_summary_of_the_evidence_for_causality_TCE_PCE_508.pdf
(last visited Jun. 27, 2023).
2
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 2 of 45
9. On August 10, 2022, the CLJA was signed into law. After many years of having no
legal recourse, the thousands of people seeking justice for their injuries and for deaths caused by
the contaminated water at or from Camp Lejeune were now able to file administrative claims
seeking compensation.
10. Importantly, the requirements to prevail on an action under the CLJA exclude any
obligation that the claimants prove negligence or fault. The CLJA specifies the requirements
claimants must satisfy as showing harm and a sufficient causal connection between that harm and
the contaminants at Camp Lejeune, waiving any obligation to prove that the United States owed
or breached a duty to those affected.
11. Moreover, as to causation, claimants need only satisfy an equipoise standard,
showing that such a causal relationship is at least as likely as not.
12. Upon information and belief, as of the date of filing, the vast majority of the
administrative claims submitted under the CLJA have not received a response.
13. This is the position from which Plaintiffs bring their actions. After being exposed
to contaminated water at or from Camp Lejeune, Plaintiffs suffered severe diseases, illnesses,
injuries, and conditions, leading to death in many cases. Those who had been injured or died were
misled for decades to believe that these injuries were not connected to the contaminated water at
or from Camp Lejeune. Then, after this connection was later admitted, Plaintiffs were told that
they were barred from any legal recourse, even as more and more details came to light about the
ongoing disregard for water safety that led to the problem. Those who had been exposed were left
abandoned until the CLJA was passed. Now, after seeking compensation through an administrative
claim, Plaintiffs have not had their claims resolved through the administrative claims process and
thus seek recourse through the instant lawsuits under the CLJA.
3
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 3 of 45
II. NATURE OF THIS MASTER COMPLAINT
14. Each individual Plaintiff brings or will bring their own individual action through
an individual complaint, including Short Form Complaints. This Master Complaint sets forth
common allegations of fact and law applicable to all Plaintiffs who adopt these allegations by
filing individual Short Form Complaints by the relevant deadlines set by the CLJA and this Court.
This Master Complaint is meant to be read in concert with the individual Short Form Complaints
and does not include individualized allegations about each Plaintiff’s experiences. For any given
Plaintiff who adopts the Master Complaint’s allegations, the totality of that Plaintiff’s allegations
includes both the common allegations of the Master Complaint plus the individual allegations in
that Plaintiff’s Short Form Complaint.
15. This Master Complaint does not constitute a waiver or dismissal of any actions or
claims asserted in any individual complaints, nor does it waive any Plaintiff’s rights, including
their right to amend their individual complaints.
III. JURISDICTION, VENUE, AND CONDITIONS PRECEDENT
16. The CLJA creates a “federal cause of action relating to water at Camp Lejeune,
North Carolina.” Thus, pursuant to the CLJA, the United States has waived its sovereign immunity
and has authorized the instant lawsuit.
17. CLJA Section 804(d) provides that the “United States District Court for the Eastern
District of North Carolina shall have exclusive jurisdiction over any [CLJA action] and shall be
the exclusive venue for such an action.” Thus, both jurisdiction and venue are proper before this
Court.
18. Plaintiffs have each filed administrative claims with the Department of the Navy
addressing the issues raised in this Master Complaint no less than six months prior to their filing
4
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 4 of 45
of an individual complaint. Plaintiffs’ claim numbers are unavailable because the Department of
the Navy has not yet assigned claim numbers. Plaintiffs’ administrative claims have either (a)
received a final denial or (b) been deemed a final denial because six months have passed since the
claims were filed with the Department of the Navy and they remain without a final disposition.
The conditions precedent required by 28 U.S.C. § 2675 and CLJA § 804(h) are satisfied.
IV. PARTIES
19. Plaintiffs are individuals—including present and former Marines and other military
service members, civilian employees, and family members or guests of former service members
or civilian employees—who resided, worked, or were otherwise exposed to water contamination
at or from Camp Lejeune for not less than 30 days during the period between August 1, 1953, and
December 31, 1987. At all times Plaintiffs resided, worked, or were otherwise exposed to water
contamination at or from Camp Lejeune. Plaintiffs’ claims may in certain instances be brought by
authorized legal representatives on their behalf.
20. Defendant, United States of America (“United States”), owned, operated, and
managed Camp Lejeune at all relevant times, by and through its Department of the Navy (“Navy”)
and the Navy’s component, the United States Marine Corps (“Marine Corps”). Congress, through
the CLJA, has recognized that Defendant United States should provide compensation for those
who were harmed by exposure to the contaminated water at Camp Lejeune.
21. The Navy and the Marine Corps are branches of the United States military. The
United States is responsible for both branches and all related facilities, including Camp Lejeune.
V. FACTUAL ALLEGATIONS
22. In 1941, Congress authorized funding for the project and construction of the base
began. Between 1941 and 1943, Camp Lejeune underwent massive construction and expansion.
5
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 5 of 45
In 1942, the base was named Marine Barracks Camp Lejeune, and renamed Marine Corps Base
Camp Lejeune in 1944. It has played a significant role in United States military operations ever
since. Yet, despite its immeasurable contributions, the United States allowed these Marines and
service members—along with their families and others who lived or worked at or near Camp
Lejeune—to be poisoned for decades through the water provided on base.
A. BACKGROUND INFORMATION
23. At all relevant times, Camp Lejeune was divided into various water distribution
systems. It is important to distinguish these areas to understand where the contamination and
exposure occurred. The relevant water distribution systems included Hadnot Point, Holcomb
Boulevard, and Tarawa Terrace. These water distribution systems are identified on the map below
(“Area Map”).4
4
U.S. Marine Corps, Camp Lejeune Drinking Water System Service Areas, https://clnr.hqi.usmc.mil/clwater/pages/
map.aspx (last visited Jun. 26, 2023).
6
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 6 of 45
24. Each of these water distribution systems received water from its individual water
treatment plant. A conceptual representation of the flow of water within each water distribution
system is provided below.5 Untreated water flows from a number of wells in each water
distribution system to that area’s water treatment plant, where the water is filtered and treated.
Water that has undergone filtration and treatment at the treatment station (“finished water”) then
flows to a reservoir, where it waits until it is needed, at which point it flows to the base facility for
delivery.
25. The water treatment plants employed “a lime softening process, using a catalytic
precipitation lime contact tank and pressure filters.”6 This process is ineffective for removing
volatile organic compounds (“VOCs”)—a category which includes each of the primary
contaminants detected in Camp Lejeune water—allowing them to pass through the water treatment
plant into the reservoir, and flow through the system to the point of delivery.
5
U.S. Marine Corps, Camp Lejeune Water System, https://clnr.hqi.usmc.mil/clwater/pages/WaterSystem.aspx (last
visited Jun. 27, 2023).
6
Study of Two Water Plants, Tarawa Terrace – Montford Point (April 1979), at 1, available at https://tftptf.com/CLW_
Docs/CLW0188.pdf (last visited Jun. 27, 2023).
7
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 7 of 45
26. The following map (“Well Map”) shows the locations of certain supply wells within
the Hadnot Point, Holcomb Boulevard, and Tarawa Terrace water distribution systems.7 It also
highlights three of the primary contamination sources: the Hadnot Point Industrial Area, the
Hadnot Point Landfill Area, and ABC One-Hour Cleaners.
7
Morris L. Maslia et al., Reconstructing Historical VOC Concentrations in Drinking Water for Epidemiological
Studies at a U.S. Military Base: Summary of Results, 8 Water 449 (2016), available at https://pubmed.ncbi.nlm.nih.
gov/28868161/#&gid=article-figures&pid=figure-1-uid-0 (last visited Jun. 27, 2023).
8
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 8 of 45
27. There were times when the demand in one water distribution system exceeded the
supply from its wells. During these times, water from one water distribution system’s reservoir
would be pumped to another water distribution system to fill the need.
28. Base facilities could receive contaminated water in one of two ways. First, if a
source well in its water distribution system was contaminated, that water would be mixed with the
water from all other wells in its water distribution system whenever it was in use, leading to all
finished water in the system’s reservoir being contaminated. Second, even if no source wells within
the immediate water distribution system were contaminated, if the water distribution system drew
supplemental finished water from a water distribution system that did have contaminated wells,
that contaminated finished water would also be delivered in the supplemented water distribution
system.
29. A number of contaminants have been detected in the Camp Lejeune water supply.
The five that have been identified to date as the most harmful and widespread are all classified as
volatile organic compounds: tetrachloroethylene (“PCE”), trichloroethylene (“TCE”),
dichloroethylene (“DCE”), vinyl chloride, and benzene.
30. Today, the EPA regulates the maximum contaminant levels (“MCL”) for each of
these five contaminants. The MCL indicates the level of exposure at which there are no known or
anticipated adverse health effects. When individuals are exposed to these contaminants at levels
that exceed these MCLs, it is understood that there is a risk of adverse health effects.
9
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 9 of 45
31. Units of parts-per-billion (“ppb”) are used in measuring water contamination. A
measurement of 1 ppb means that among a sample of 1 billion particles, 1 particle of the measured
substance is present. 1 ppb is equal to 1 microgram-per-liter (“µg/L”). 1,000 ppb (or 1,000 µg/L)
is equal to 1 part-per-million (“ppm”) or 1 milligram-per-liter (“mg/L”).8
32. The current EPA MCL for PCE is 5 ppb. Finished water at Camp Lejeune reached
at least 215 ppb of PCE.
33. The current EPA MCL for TCE is 5 ppb. Finished water at Camp Lejeune reached
at least 1,400 ppb of TCE.
34. The current EPA MCL for DCE is 7 ppb. Finished water at Camp Lejeune reached
at least 406 ppb of DCE.
35. The current EPA MCL for vinyl chloride is 2 ppb. Finished water at Camp Lejeune
reached at least 2.9 ppb of vinyl chloride.
36. The current EPA MCL for benzene is 5 ppb. Finished water at Camp Lejeune
reached at least 2,500 ppb of benzene.
8
Okla. Dep’t Env’t Quality, Test Result Interpretation, https://www.deq.ok.gov/state-environmental-laboratory-
services/technical-assistance/test-result-interpretation/ (last visited Jun. 27, 2023).
10
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 10 of 45
1. HADNOT POINT
37. Hadnot Point is the southernmost highlighted area on both the Area Map and the
Well Map, located below Holcomb Boulevard, and Tarawa Terrace.
38. Much of the infrastructure of Hadnot Point was built during the early construction
of Camp Lejeune in 1941. This included the Hadnot Point Water Treatment Plant, as well as many
of the source wells.
39. The Hadnot Point Fuel Farm was also constructed in 1941, comprised of one
600,000-gallon aboveground tank, six 12,000-gallon underground tanks, and eight 15,000-gallon
underground tanks. In total, these tanks held up to 792,000 gallons of fuel.
40. The Hadnot Point Fuel Farm was built in close proximity to important supply wells
which provided water to the Hadnot Point Water Treatment Plant. In particular, the fuel farm was
a mere 1,200 feet from supply well HP-602.
41. In 1972, supply well HP-651 was installed adjacent to the defense property disposal
compound (labeled “Hadnot Point Landfill Area” in the Well Map above), which had been
functioning as a junkyard and solvent disposal area for decades.
42. At all relevant times, Hadnot Point has been one of the primary housing areas on
base, containing a majority of the barracks for unmarried military personnel. The Hadnot Point
water distribution system includes Hospital Point housing, French Creek barracks, and Hadnot
Point barracks.
43. In addition, Hadnot Point provided water to all of Holcomb Boulevard until the
Holcomb Boulevard water distribution system was established in or about June of 1972. This
included Midway Park housing, Paradise Point general officer housing, Paradise Point two-story
11
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 11 of 45
housing, Paradise Point cracker box housing, Paradise Point Cape Cod housing, Paradise Point
Capehart housing, Watkins Village housing, and Berkeley Manor housing.
44. Hadnot Point also contained the Hadnot Point Industrial Area, which included the
Hadnot Point Fuel Farm and major maintenance facilities. When Camp Lejeune first came under
scrutiny, the United States disclosed a fuel leak here of 20,000 to 30,000 gallons in 1979. It was
later revealed that upwards of approximately 1.1 million gallons of fuel were lost into the soil at
Hadnot Point Fuel Farm, with an average of more than 20,000 gallons per year.
45. Hadnot Point also included a number of other areas believed to have contributed to
groundwater contamination, such as the base dump, which included a dump for chemical drums,
a liquid-disposal dumping area, a former burn dump, a fuel tank sludge dumping area, an industrial
fly-ash dump, a transformer storage lot, an open storage pit, and a junkyard. Also, Hadnot Point
had a former fire training area and a former on-base dry-cleaning service.
46. Hadnot Point was also one of many locations on the base where marines used TCE
(at the instruction of the United States) as a degreaser to remove grease, oils, and waxes from all
variety of metal equipment and vehicles.
47. In 1980, a U.S. Army Lab conducted testing on water samples from Hadnot Point.
The Laboratory Services Chief included a handwritten note on the report stating “[w]ater is highly
contaminated with low molecular weight halogenated hydrocarbons.”9
48. In 1981, the same U.S. Army Lab sent a subsequent communication, with the
Laboratory Services Chief emphasizing in another handwritten note that “[w]ater is highly
contaminated with other chlorinated hydrocarbons (solvents)!”10
9
TTHM Surveillance Report Form (Collected Oct. 21, 1980), available at https://tftptf.com/CLW_Docs/CLW
0436.pdf (last visited Jun. 27, 2023).
10
TTHM Surveillance Report Form (Collected Feb. 26, 1981), available at https://tftptf.com/CLW_Docs/CLW
0443.pdf (last visited Jun. 27, 2023).
12
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 12 of 45
49. In 1982, the United States retained Grainger Laboratories (“Grainger”) as a
consultant to study the water supply at Camp Lejeune. Grainger was not informed of the previous
testing and the elevated levels that had been detected.
50. In May of 1982, Grainger detected elevated levels of PCE and TCE in the water
supply at Hadnot Point.11 In particular, a sample taken from the Naval Hospital was found to
contain 1,400 ppb of TCE.
51. In at least July of 1982, December of 1982, and March of 1983, Grainger warned
relevant personnel that these contaminants required attention.
52. In July 1984, supply well HP-602 was sampled and found to contain 380 ppb of
benzene.
53. On November 30, 1984, supply well HP-602 was closed. A few days later, it was
sampled again and found to contain 121 ppb of benzene, 24 ppb of PCE, and 1,600 ppb of TCE.
54. In December of 1984, multiple wells in Hadnot Point were sampled again, and wells
601, 608, 634, and 637 were closed due to contamination.
55. On January 8, 1985, a communication noted that benzene is a highly volatile
compound which may not be detected in tests if there is a delay in analysis.12
56. On January 16, 1985, additional samples were taken of Hadnot Point wells.
57. In late January of 1985, Hadnot Point supplied water to the Holcomb Boulevard
water distribution system while the Holcomb Boulevard water treatment plant was offline.
58. On January 31, 1985, water samples were collected from locations throughout
Holcomb Boulevard, which was receiving water from Hadnot Point at the time. These samples
11
See May 6, 1982, Call Notes, available at https://tftptf.com/CLW_Docs/CLW0542.pdf (last visited Jun. 27, 2023).
12
See Volatile Organic Chemical Analysis Reports, at *2, available at https://tftptf.com/CLW_Docs/CLW5237.pdf
(last visited Aug. 28, 2023).
13
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 13 of 45
contained high levels of TCE, revealing that Hadnot Point water was still contaminated. The
highest known reading, in a sample taken from an elementary school, was at 1,148.4 ppb.
59. On February 4, 1985, the Holcomb Boulevard water treatment plant was
reactivated, both the Holcomb Boulevard and Hadnot Point systems were flushed, and the results
of the January 16, 1985, samples were received. Hadnot Point supply well HP-651 was revealed
to contain 3,200 ppb of TCE. HP-651 was closed at this time and resampled.13
60. The results of this resampling were even higher: 18,900 ppb of TCE, 8,070 ppb of
DCE, 400 ppb of PCE, and 179 ppb of vinyl chloride.14
61. In the same series of samples, a February 5, 1985, sample from the Hadnot Point
water treatment plant was found to still contain 429 ppb of TCE, even though wells HP-602 and
HP-651 were both closed.15
62. On November 19, 1985, a water sample from the Hadnot Point water treatment
plant tested at 2,500 ppb of benzene.
63. Another water sample, on December 10, 1985, tested at 38 ppb of benzene.
64. A January 24, 1986, memorandum analyzing these results stated that “[w]hile the
periodic readings for Benzene are felt to be a quality control problem in sampling and/or laboratory
analysis, samples of each active raw water well for Hadnot Point was [sic] taken … last week.
Results are anticipated in early February.”16 Upon information and belief, these results are missing.
65. On January 13, supply well HP-645 was closed due to benzene contamination.17
13
Feb. 26, 1985, Chronology prepared by Elizabeth Betz, available at https://tftptf.com/CLW_Docs/CLW4546.pdf
(last visited Aug. 27, 2023).
14
Id.
15
See Volatile Organic Chemical Analysis Reports, at *30, available at https://tftptf.com/CLW_Docs/CLW5237.pdf
(last visited Aug. 28, 2023).
16
Analysis of Drinking Water Systems Aboard Camp Lejeune/MCAS, New River (Jan. 24, 1986), available at
https://tftptf.com/CLW_Docs/CLW1406.pdf (last visited Jun. 27, 2023).
17
See Review of N.A.C.I.P. Program, Marine Corps Base, Camp Lejeune (Jan. 21, 1987), at *6, available at
https://tftptf.com/CLW_Docs/CLW4963.pdf (last visited Jun. 27, 2023).
14
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 14 of 45
66. On February 5, 1987, a project was proposed to replace and relocate the leaking
Hadnot Point Fuel Farm, including a plan for temporary measures to be used while the project was
underway that would avoid continued use of the Hadnot Point Fuel Farm.18 As of May 18, 1988,
that project was still pending funding.
67. On March 29, 1988, a letter from a Marine Corps attorney urged the immediate
replacement of the fuel tanks at the Hadnot Point Fuel Farm, which were estimated to be leaking
approximately 1,500 gallons of fuel per month. This letter stated in part: “From an attorney’s
perspective, concerned with responding to potential litigation, it appears patently unreasonable to
wait until out-years to replace the tanks. Such delay will result in an indefensible waste of money,
and a continuing potential threat to human health and the environment.”19
68. A December 1988 study of the groundwater near the Hadnot Point Fuel Farm noted
several points of concern. In particular, it found a plume of contamination of up to 15 feet in
thickness and that the local geology consisted primarily of silty sand, meaning the contamination
was not confined to the local area.20
69. In or about 1990-91, the Hadnot Point Fuel Farm was replaced and closed.
70. The United States has since conceded that benzene levels in drinking water
exceeded safe levels for both children and adults from at least 1979 until 1984.21 However, the
later disclosure of the hidden information contained in the Navy’s UST archive, showing that an
18
See Response to Documented Groundwater Contamination at Hadnot Point Fuel Farm (May 18, 1988), available
at https://tftptf.com/CLW_Docs/CLW1737.pdf (last visited Jun. 27, 2023).
19
Construction Contract 89-B-2611, Temporary Fuel Farm (Aug. 9, 1989), at 33-34, available at
https://www.tftptf.com/CERCLA/00096.pdf (last visited Jun. 27, 2023).
20
See Contaminated Ground Water Study, Marine Corps Base Camp Lejeune, N.C., Hadnot Point Area (December
1988), at 11, 14, available at https://www.tftptf.com/CERCLA/00417.pdf (last visited Jun. 27, 2023).
21
See Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t
of Health and Hum. Servs., Public Health Assessment for Camp Lejeune Drinking Water 9 (Jan. 20, 2017) (“ATSDR
2017 PHA”), available at https://www.atsdr.cdc.gov/HAC/pha/MarineCorpsBaseCampLejeune/Camp_Lejeune_
Drinking_Water_PHA(final)_%201-20-2017_508.pdf (last visited Jun. 27, 2023).
15
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 15 of 45
average of more than 21,000 gallons of fuel were lost into the soil each year, suggests that benzene
contamination began much earlier.22
71. The United States has further conceded that, within the Hadnot Point water
distribution system, at least one volatile organic compound has exceeded its current EPA MCL at
all times between at least August 1953 and January 1985.23
2. HOLCOMB BOULEVARD
72. Holcomb Boulevard is the middle-highlighted area on both the Area Map and the
Well Map, located north of Hadnot Point and south of Tarawa Terrace.
73. During the relevant time period, finished water at Holcomb Boulevard had high
levels of contamination through 1972 by way of being served by the Hadnot Point water treatment
plant.
74. In 1972, the Holcomb Boulevard water distribution system was established. This
included the drilling of a number of new supply wells, as well as the construction of a new water
treatment plant and reservoirs for this water distribution system. However, from 1972 to 1987, the
Holcomb Boulevard water distribution system received supplemental water from Hadnot Point,
leading to continued contamination in Holcomb Boulevard finished water.
75. At all relevant times, Holcomb Boulevard has been one of the primary housing
areas on base. The Holcomb Boulevard water distribution system includes Midway Park housing,
Paradise Point general officer housing, Paradise Point two-story housing, Paradise Point cracker
22
H.R. Rep. No. 111-108 (Sept. 16, 2010), at 6, available at https://www.govinfo.gov/content/pkg/CHRG-
111hhrg58485/pdf/CHRG-111hhrg58485.pdf (last visited Jun. 27, 2023).
23
See Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t
of Health and Hum. Servs., Camp Lejeune, Background (page last reviewed Jan. 16, 2014),
https://www.atsdr.cdc.gov/sites/lejeune/background.html (last visited Jun. 27, 2023).
16
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 16 of 45
box housing, Paradise Point Cape Cod housing, Paradise Point Capehart housing, Watkins Village,
and Berkeley Manor housing.
76. Although the Holcomb Boulevard water distribution system (once opened) did not
have the significant sources of contamination that the Hadnot Point water distribution system did,
the Holcomb Boulevard water distribution system remained interconnected with the Hadnot Point
water distribution system, and raw or finished water could be and indeed was pumped from one
water distribution system to the other. This exchange was controlled by two isolation valves,
referred to as Booster Pump 742 and the Marston Pavilion Valve.
77. The United States has conceded that, during times when Hadnot Point water was
transferred to Holcomb Boulevard, TCE levels in Holcomb Boulevard finished water were
anywhere from two to twelve times the levels permitted by current EPA MCLs.24
78. In January of 1985, a gas line feeding a generator at the Holcomb Boulevard water
treatment plant leaked gasoline into the Holcomb Boulevard water system. As a result, the
Holcomb Boulevard water treatment plant was offline for nine days, during which time water from
Hadnot Point was pumped to the Holcomb Boulevard water distribution system. During this
period, finished water in housing areas throughout Holcomb Boulevard exceeded 50 ppb of TCE.25
This recorded instance is illustrative of the effect of distributing Hadnot Point water to Holcomb
Boulevard.
24
See Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t
of Health and Hum. Servs., Analyses and Historical Reconstruction of Groundwater Flow, Contaminant Fate
Transport, and Distribution of Drinking Water Within the Service Areas of the Hadnot Point and Holcomb Boulevard
Water Treatment Plants and Vicinities, U.S. Marine Corps Base Camp Lejeune, North Carolina, Chapter A: Summary
and Findings (March 2013) (“ATSDR Reconstruction”), at A67, available at https://www.atsdr.cdc.gov/sites/lejeune/
docs/chapter_A_hadnotpoint.pdf (last visited Jun. 27, 2023).
25
ATSDR Reconstruction at A68.
17
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 17 of 45
79. The official position of the United States is that occasions where Hadnot Point
water was pumped to Holcomb Boulevard were infrequent.26 The estimates put forth by the United
States as to the frequency of this exchange, as well as the derivative reconstructed estimates of
contamination levels at Holcomb Boulevard, are based upon review of incomplete water utility
logbooks from Booster Pump 742 and Marston Pavilion. The United States concedes that the
“valve openings are only partially documented.”27
80. The treated water from the Holcomb Boulevard water treatment plant was used to
water the greenery on two base golf courses, routinely drawing 300,000 to 500,000 gallons of
water per day. This resulted in frequent shortages of treated water in the Holcomb Boulevard water
distribution system, requiring supplemental treated water from Hadnot Point.
81. Upon information and belief, the Marston Pavilion valve was regularly activated.
82. Some or all of the relevant logbooks and documents related to the operation of the
control valves at Marston Pavilion and Booster Pump 742 are missing.
83. As demonstrated by the 1,148.4 ppb TCE reading at the Berkley Manor Elementary
school on February 7, 1985, at the times when this exchange was activated and Hadnot Point water
was provided to Holcomb Boulevard, Holcomb Boulevard residents were exposed to high levels
of contamination.
3. TARAWA TERRACE
84. Tarawa Terrace is the northeastern region on the Area Map, and the northern region
on the Well Map, north of Holcomb Boulevard, and east of Camp Johnson.
26
ATSDR Reconstruction at A13.
27
ATSDR Reconstruction at A64.
18
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 18 of 45
85. In 1952, construction was completed on a new Camp Lejeune subdivision named
Tarawa Terrace. This subdivision included its own water treatment plant and water distribution
system.
86. Three of the initial supply wells providing water to Tarawa Terrace were
constructed down gradient from dry cleaning businesses, car repair shops, and gas stations.
87. In 1952, supply well TT-26 was constructed at the very edge of the Camp Lejeune
property line, along Lejeune Boulevard. At the time of construction, this was already down-
gradient from Glamorama dry cleaners, car repair shops, and gas stations. Nevertheless, the well
was drilled to a depth of only 95 feet. It is unknown why this well was not drilled deeper, despite
the average well on Camp Lejeune being approximately 180 feet.
88. In 1953, ABC One Hour Dry Cleaner (“ABC”) began operating across Lejeune
Boulevard from well TT-26, only 900 feet away. Once it began operating, ABC used
approximately 110-165 gallons of PCE per month. The PCE used by ABC generated two types of
waste: solid and liquid.
89. The liquid PCE waste, contained in wastewater, was disposed of through a soil
absorption septic tank. In other words, it was dumped into the ground approximately 900 feet from
well TT-26.
90. The solid PCE waste was used to fill potholes, or otherwise disposed of in the
ground behind the building of ABC, where rainwater caused additional PCE to leach into the soil,
approximately 900 feet from well TT-26.
19
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 19 of 45
91. The United States has conceded that estimated PCE levels were above current
MCLs from at least November of 1957 until January of 1985.28
92. Following the January 1985 generator fuel line leak at the Holcomb Boulevard
water treatment plant, additional testing was also conducted at Tarawa Terrace. Supply well TT-
26 was found to contain 1,580 ppb of PCE, as well as 57 ppb of TCE, 92 ppb of DCE, and 27 ppb
of vinyl chloride. In addition, supply well TT-23 was found to contain 132 ppb of PCE, 5.8 ppb of
TCE, and 11 ppb of DCE.
93. Both wells were shut off on February 8, 1985.
94. Yet, one or more of these contaminated wells were reactivated in times of water
supply shortage until the Tarawa Terrace water treatment plant was closed in March of 1987. A
memorandum discussing this decision noted that “the potential health hazards must be weighed
against the need and cost of providing water from other sources.”29
95. The United States has conceded that estimated PCE levels remained elevated until
the Tarawa Terrace water treatment plant was closed in March of 1987, exceeding current MCLs
in all but two months.30
96. The Tarawa Terrace water distribution system and the Camp Johnson water
distribution system were “joined together” and capable of exchanging water.31
28
ATSDR Reconstruction App’x A2 at A83-A93, available at https://www.atsdr.cdc.gov/sites/lejeune/docs/Re
constructed%20TTWTP%20Concentrations_ATSDR_Chapter%20A%20Report_Camp%20Lejeune.pdf (last visited
Jun. 27, 2023).
29
Alternatives for Providing Water to the Tarawa Terrace Area (Mar. 1, 1985), available at
https://tftptf.com/CLW_Docs/CLW1129.pdf (last visited Jun. 27, 2023).
30
ATSDR Reconstruction App’x A2 at A93, available at https://www.atsdr.cdc.gov/sites/lejeune/docs/Re
constructed%20TTWTP%20Concentrations_ATSDR_Chapter%20A%20Report_Camp%20Lejeune.pdf (last visited
Jun. 27, 2023).
31
Inadequate Raw Water Supply at Tarawa Terrace and Camp Johnson (Mar. 30, 1983), available at https://tftptf
.com/CLW_Docs/CLW0707.pdf (last visited Jun. 27, 2023).
20
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 20 of 45
97. The Tarawa Terrace water distribution system and Camp Johnson water
distribution system were interconnected enough to jointly supply water to the Knox Trailer Park.
98. Upon information and belief, contaminated water may have also been present
within the Camp Johnson water distribution system during the relevant time period.
4. WATER BUFFALOES
99. In the military context, a water buffalo refers to a portable water tank, typically a
400-gallon tank mounted on a towable trailer, used for storing and transporting water.
100. Upon information and belief, during field training exercises, the Marine Corps
routinely uses water buffaloes, including during all relevant times at Camp Lejeune. By using
water buffaloes, service members at Camp Lejeune were able to leave the main areas of the base
to conduct field training exercises away from water supplies, relying on the water buffaloes to
supply water throughout the training.
101. Upon information and belief, service members at Camp Lejeune were typically
spending an average of three days per week engaged in such field training exercises.32
102. Upon information and belief, these trainings were often for extended periods of
time, lasting for several hours or more. Throughout the duration of these trainings, the water
buffaloes were the primary source of drinking water for all participants.
103. The United States has conceded that water buffaloes filled with Hadnot Point water
provided contaminated drinking water to service members during trainings.33
32
Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t of
Health and Hum. Servs., Twenty-Seventh Meeting of Camp Lejeune Community Assistance Panel (CAP) Meeting
Transcript (Apr. 4, 2014), at 64, available at https://www.atsdr.cdc.gov/sites/lejeune/docs/transcript-4_14.pdf (last
visited Jun. 27, 2023).
33
Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t of
Health and Hum. Servs., Camp Lejeune Public Meeting (9-19-2020) – Q&A, at *42, available at https://www.
atsdr.cdc.gov/sites/lejeune/docs/transcripts/CAP-Public-meeting-QA-Sept-2020-508.pdf (last visited Jun. 27, 2023).
21
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 21 of 45
104. Upon information and belief, at all relevant times, contaminated water from the
Hadnot Point water distribution system and/or other contaminated sources was used to fill water
buffaloes routinely used for field training exercises conducted throughout the base.34 This included
at least all regions on the east side of the New River, including Camp Johnson, Tarawa Terrace,
Paradise Point, Holcomb Boulevard, Hadnot Point, Courthouse Bay, Onslow Beach, and the
broader Camp Lejeune Military Reservation. Moreover, this potentially included regions on the
west side of the New River, including Camp Geiger, Stone Bay, and Marine Corps Air Station
New River.
105. Further, upon information and belief, water buffaloes filled with contaminated
water from the Hadnot Point water distribution system and/or other contaminated sources were
also used for extended field training exercises conducted outside of Camp Lejeune, including at
Marine Corps Auxiliary Field Bogue, also known as Bogue Field.
106. Upon information and belief, water from Hadnot Point contaminated with PCE,
TCE, DCE, vinyl chloride, and benzene was provided to Marines and other service members from
all over the base who conducted field training exercises at any of the above-referenced locations.
107. Upon information and belief, virtually all Marines and other service members who
engaged in field training at Camp Lejeune did so at least in part on the east side of the New River,
including those attending recruit training or infantry training at Camp Geiger.
108. Upon information and belief, during warm weather, water buffaloes were also
placed in many locations around the base to provide easy access to water and encourage hydration,
34
See id.; see also Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and
Prevention, Dep’t of Health and Hum. Servs., Twenty-Sixth Meeting of Camp Lejeune Community Assistance Panel
(CAP) Meeting Transcript (Sep. 6, 2013), at 101, available at https://www.atsdr.cdc.gov/sites/lejeune/docs/CAP
transcript_9_13.pdf (last visited Jun. 27, 2023).
22
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 22 of 45
many or all of which were filled using contaminated water from the Hadnot Point water
distribution system and/or other contaminated sources.
109. The United States has conceded that “we assume that everybody at [Camp] Lejeune
had some exposure because even if you didn’t live in a residence on base that received
contaminated water, you did visit the main side, you did train, you drank [from] the water buffaloes
that were served – provided by Hadnot Point water, so on and so forth. So everyone was
exposed[.]”35
110. During the relevant time period, people living or working at Camp Lejeune were
exposed to the contaminated water through a number of cumulative exposure pathways. These
included drinking, showering, bathing, toiletry, swimming, food preparation, dishwashing,
laundry, inhalation from volatilization (i.e., one or more of the chemicals can turn into a gas at
room temperature), inhalation from vapor intrusion from groundwater through soil, and more.
Harmful exposure could and did occur through ingestion, inhalation, and dermal contact.
111. Moreover, marines in training drink water and shower more than most people. The
United States has recognized that “[a] marine in training at Camp Lejeune consumes an estimated
6 liters of water per day for three days per week and 3 liters per day the rest of the week. Under
warm weather conditions, a marine may consume between 1 and 2 quarts of water per hour and
shower twice a day. It is likely that during training, the water supplied in the field came from the
Hadnot Point water system with both measured and estimated levels of TCE and PCE substantially
higher than their MCLs.”36
35
Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention, Dep’t of
Health and Hum. Servs., Forty-Second Meeting of Camp Lejeune Community Assistance Panel (CAP) Meeting
Transcript (Apr. 24, 2019), available at https://www.atsdr.cdc.gov/sites/lejeune/docs/transcripts/cap_april_2019_
508.pdf (last visited Jun. 27, 2023).
36
ATSDR Evidence Assessment at 3.
23
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 23 of 45
5. ADDITIONAL WATER CONTAMINATION FACTS
112. The United States played a significant role in causing and allowing the continuance
of the water contamination at Camp Lejeune, including its efforts to conceal the presence and
extent of the contamination.
113. In 1948, a study conducted by the American Petroleum Institute concluded that the
only safe concentration for benzene is zero.37
114. Placing and operating a major supply well (HP-602) only 1,200 ft—less than a
quarter mile—from the base’s primary fuel depot risked contaminating the water supply.
115. Placing and operating a major supply well (TT-26) only 900 ft—just over an eighth
of a mile—down-gradient from a business which dumped chemicals into the ground risked
contaminating the water supply.
116. Placing and operating a major supply well (HP-651) adjacent to a base dump,
including a junkyard, both of which housed metal waste exposed to metal degreasers containing
TCE, risked contaminating the water supply.
117. A 1958 study conducted by a government contractor (Legrand) concluded that the
wells used at Camp Lejeune would require frequent maintenance inspections and repairs. These
inspections and repairs were not completed.
118. A 1959 study by Legrand found that the aquifer beneath Camp Lejeune was not
well-protected from surface contamination because the layers of clay, which can serve as a barrier
to restrict the movement of contaminants, were thin and not continuous. No changes were made to
reduce this risk or monitor for the predicted contamination.
37
See Am. Petroleum Inst., API Toxicological Review, Benzene 4 (Sept. 1948), available at https://fix
ourfuel.com/wp-content/uploads/2016/05/API-Benzene-Toxicology-Review-2.pdf (last visited Jun. 27, 2023).
24
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 24 of 45
119. Also in 1959, the Navy’s Bureau of Medicine and Surgery (“BUMED”) issued
instruction 6240.3A, regarding Navy standards for potable water. Among other things, instruction
6240.3A recognized that “irregularity in quality is an indication of potential danger.”38 Thus, by
at least 1959, the United States understood that water samples showing contamination cannot be
disregarded because the contamination levels are irregular.
120. In 1963, BUMED issued NAVMED P-5010-5, governing potable water at onshore
Navy facilities such as Camp Lejeune. It was recognized in the document that “well waters
obtained from aquifers beneath impervious strata . . . are usually considered sufficiently protected
to preclude need for purification,” highlighting by contrast that the Camp Lejeune aquifer’s thin
and discontinuous clay layers left the water supply under-protected. This document recognized
that carbon chloroform extract (“CCE”) tests were a practical measure of water quality at the time,
and that “water supplies containing over 200 micrograms CCE/1 of water represent an exceptional
and unwarranted dosage of the water consumer with ill-defined chemicals.” Moreover, it further
directed that water sampling be conducted once per year on finished water, the primary supply of
raw water, and raw water from each supply well39 during the relevant time period.
121. Later in 1963, BUMED issued instruction 6240.3B. This new regulation prohibited
not only substances known to be toxic, but also substances for which the physiological effects
were unknown, from being permitted to reach the water consumers.40
122. In 1972, BUMED issued instruction 6240.3C. This document reduced the total
allowable detection under a CCE test from 200 ppb to 150 ppb. It also provided that a detection of
38
Bureau of Med. & Surgery, Dep’t of the Navy, BUMED Instruction 6240.3A (Dec. 24, 1959), at 2, available at
https://tftptf.com/CLW_Docs/BUMED62403A.pdf (last visited Aug. 9, 2023).
39
Bureau of Med. & Surgery, Dep’t of the Navy, Manual of Naval Preventive Med., Chapter 5: Water Supply Ashore
(Aug. 1963), at 14, 32, 40, available at https://www.tftptf.com/New_ATSDR1/NAVMED_P-5010-5_1963.pdf (last
visited Aug. 9, 2023).
40
Bureau of Med. & Surgery, Dep’t of the Navy, BUMED Instruction 6240.3B (Sept. 30, 1963), at 3, available at
https://tftptf.com/CLW_Docs/BUMED62403B.pdf (last visited Aug. 9, 2023).
25
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 25 of 45
only 3 to 100 ppb of chlorinated hydrocarbons constituted grounds for rejection of the water
supply. During the relevant time, contaminants of concern at Camp Lejeune included chlorinated
hydrocarbons, which were often found in concentrations exceeding the established range.
123. In 1977, a government contractor (SCS Engineers) prepared a report for the Atlantic
Division Naval Facilities Engineering Command (“LantNavFacEngCom”) on an oil pollution
survey at Camp Lejeune conducted in 1976. Upon information and belief, the United States has
refused to release the uncensored version of this report to this day.
124. Also in 1977, a government contractor (Southern Testing and Research
Laboratories) was retained by Camp Lejeune to test water for four chlorinated hydrocarbons and
two herbicides.
125. On February 28, 1978, in a letter to Charles Rundgren of the North Carolina
Division of Health Services, the United States committed to submit all monitoring data, operational
logs, and special analyses concerning Marine Corps activities within the state. This commitment
was not maintained.41
126. In 1979, a government contractor (Henry Von Oesen and Associates) conducted a
study of the Tarawa Terrace water treatment plant. Observations included that “[s]erious operating
problems have been experienced at Tawara Terrace due to inability to properly control the process,
including cementing of filter sands, structural damage to the filter bed supports, and short filter
runs.”42 In addition, the report findings confirmed that “filter backwash [was] discharged into the
storm drainage system without treatment.”43
41
Letter from J.G. Leech to Charles E. Rundgren (Feb. 28, 1978), available at https://tftptf.com/CLW_Docs/
CLW0176.pdf (last visited Aug. 9, 2023).
42
Study of Two Water Plants, Tarawa Terrace – Montford Point (April 1979), at 2, available at https://tftptf.com/CLW
_Docs/CLW0188.pdf (last visited Jun. 27, 2023).
43
Id.
26
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 26 of 45
127. In March of 1980, the State of North Carolina assumed primary enforcement
responsibilities under the Safe Drinking Water Act for all public water systems in the state.
128. In October of 1980, concerned that the State of North Carolina might find problems
with Camp Lejeune’s potable water, LantNavFacEngCom initiated a surveillance program at
Camp Lejeune, intended to detect total trihalomethanes (“TTHMs”) in the water supply.
LantNavFacEngCom indicated that it would take a composite sample of all potable water supplies
and run a full spectrum analysis, with the understanding that if any potential problems were
identified, further testing would be conducted to locate the source. Both Jennings Laboratories and
the U.S. Army Environmental Hygiene Agency (“USAEHA”) were to conduct these tests.
129. On October 30, 1980, the United States received the results of this test from
Jennings Laboratories, showing the presence of TCE, DCE, and vinyl chloride.44
130. On the same date, the United States received the USAEHA test results. The results
included a handwritten warning: “Water is highly contaminated with low molecular weight
halogenated hydrocarbons. Strong interference in the region of ChCl2BR. Cannot determine the
value of that compound.”45
131. On December 18, 1980, additional samples were taken from the Hadnot Point area.
In a January 1981 analysis of these samples, the USAEHA laboratory services chief issued another
warning, reading: “Heavy Organic interference at CHCL2BR. You need to analyze for chlorinated
organics by GC/MS.”46
44
Jennings Lab’ys, Inc., Certificate of Analysis (Oct. 31, 1980), available at https://tftptf.com/CLW_Docs/
CLW0430.pdf (last visited Aug. 9, 2023).
45
TTHM Surveillance Report Form (Collected Oct. 21, 1980), available at https://tftptf.com/CLW_Docs/
CLW0436.pdf (last visited Aug. 9, 2023).
46
TTHM Surveillance Report Form (Collected Dec. 29, 1980), available at https://tftptf.com/CLW_Docs/
CLW0438.pdf (last visited Aug. 9, 2023).
27
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 27 of 45
132. On February 26, 1981, more samples were taken. In the results analyzed on March
9, 1981, the USAEHA laboratory services chief again warns: “Water is highly contaminated with
other chlorinated hydrocarbons (solvents)!”47
133. On August 27, 1981, the Commanding General of Camp Lejeune sent a letter to the
North Carolina state official, Mr. Rundgren. The letter discussed the analysis of the Rifle Range
water distribution system, as well as the upcoming Naval Assessment and Control of Installation
Pollutants (“NACIP”) Initial Assessment Study but withheld all information about the broader
TTHM testing and the multiple warnings of contamination.48
134. On January 14, 1982, in response to a memo from the Department of Defense, the
United States launched the NACIP Initial Assessment Study at Camp Lejeune. The objective of
this study was to identify, assess, and control contamination at military installations such as Camp
Lejeune.49
135. On April 19, 1982, the base began collecting water samples from each of the eight
water distribution systems, to be analyzed by Grainger. All information about prior detection of
contamination by Jennings Laboratories and ESAEHA was withheld from Grainger.50
136. On May 6, 1982, Grainger informed the United States that it had detected
chlorinated hydrocarbons in the samples from Hadnot Point and Tarawa Terrace.51
47
TTHM Surveillance Report Form (Collected Feb. 26, 1981), available at https://tftptf.com/CLW_Docs/
CLW0443.pdf (last visited Aug. 9, 2023).
48
Letter from C.G. Cooper, Major Gen. U.S. Marine Corps, to Charles E. Rundgren (Aug. 27, 1981), available at
https://tftptf.com/CLW_Docs/CLW6124.pdf (last visited Aug. 9, 2023).
49
Memorandum from Officer in Charge, Dept. of the Navy, to Distribution (Jan. 14, 1982), available at https://
tftptf.com/CLW_Docs/CLW0455.pdf (last visited Aug. 9, 2023).
50
Memorandum from Ms. Betz, Quality Control Lab, Envt’l. Section (Apr. 26, 1982), available at https://tftptf.
com/CLW_Docs/CLW0537.pdf (last visited Aug 9, 2023).
51
Memorandum of Grainger Lab Call (May 6, 1982), available at https://tftptf.com/CLW_Docs/CLW0542.pdf (last
visited Aug 9, 2023).
28
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 28 of 45
137. On July 28, 1982, additional samples were taken from Hadnot Point and Tarawa
Terrace and sent to Grainger. In the results analyzed on August 10, 1982, Grainger reported that
the chlorinated hydrocarbons were still detected, including identifying two specific contaminants:
TCE at 1,400 ppb and PCE at 104 ppb. This report indicated that these contaminants were at high
levels, such that they were “more important from a health standpoint than the total Trihalomethane
content.”52
138. On July 29, 1982, the supervisory base chemist, Elizabeth Betz, had a phone call
with the State of North Carolina. The two discussed reporting requirements as to total
trihalomethanes. Ms. Betz inquired about reporting requirements pertaining to secondary
contaminants, other than trihalomethanes, but did not mention that the United States had already
detected multiple contaminants at Camp Lejeune or inquire about the state’s view on any of these
specific contaminants.53
139. The United States has claimed that the Marine Corps shared information about the
contamination detected at Camp Lejeune with North Carolina state officials in August of 1982.
However, this position was later contradicted by documentary evidence and retracted. The United
States in fact withheld this information from the state for years.
140. In contrast, on August 18, 1982, the United States issued a memorandum purporting
to note that there were no problems detected in the Hadnot Point, Tarawa Terrace, or Holcomb
Boulevard water distribution systems, and reduced sampling in these areas from monthly to
quarterly.54
52
Letter from Bruce A. Babson, Chemist to Commanding Gen. Marine Corps (Aug. 10, 1982), available at https://tftptf
.com/CLW_Docs/CLW0592.pdf (last visited Aug 9, 2023).
53
Memorandum from Ms. Betz, Quality Control Lab, Envt’l. Section (July 29, 1982), available at https://tftptf.com/
CLW_Docs/CLW0587.pdf (last visited Aug 9, 2023).
54
Memorandum from Ms. Betz, Quality Control Lab, Envt’l. Section (Aug. 18, 1982), available at https://tftptf.com/
CLW_Docs/CLW0605.pdf (last visited Aug 9, 2023).
29
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 29 of 45
141. On August 25, 1982, the Commanding General of Camp Lejeune sent a letter via
his representative to the officer in charge of the NACIP Initial Assessment Study, recommending
obscuring evidence of contamination. His letter reads: “Discussion of Trihalomethane content of
Rifle Range on page 2-18 and extensive data shown on pages 6-12 through 6-18 overly stresses
relationship with hazardous materials/waste disposal. It is important to note that accuracy of data
provided by U.S. Army laboratory is questionable. It is recommended that TTHM information be
de-emphasized throughout the report.”55
142. A few weeks later, taking effect on October 1, 1982, the Natural Resources and
Environmental Affairs Branch—which had worked in conjunction with the NACIP scientists to
complete the Initial Assessment Study—was reassigned to report to the base Facilities Assistant
Chief of Staff, rather than operating within the Base Maintenance Division.56 This placed the
scientists studying contamination at Camp Lejeune under the control of base leadership.
143. On November 29, 1982, additional samples were taken from all eight water
distribution systems and sent to Grainger.57 In the results analyzed on December 9, 1982, Grainger
noted continued elevated levels of contamination.58 A Grainger scientist expressed concern over
these levels on a subsequent call discussing these results on December 21, 1982.59
55
Letter from Commanding Gen. to Officer-in-Charge, Naval Energy and Envt’l. Support Activity (Aug. 25, 1982),
available at https://tftptf.com/CLW_Docs/CLW6332.pdf (last visited Aug 9, 2023).
56
Letter from Assistant Chief of Staff, Facilities to Base Maintenance Officer (Oct. 1, 1982), available at https://
tftptf.com/CLW_Docs/CLW3882.pdf (last visited Aug 9, 2023).
57
Trihalomethane Sampling Form (Collected Nov. 29, 1982), available at https://tftptf.com/CLW_Docs/CLW
0688.pdf (last visited Aug 9, 2023).
58
Letter from Bruce A. Babson, Chemist, Grainger Laboratories, to Commanding General, Marine Corps Base (Dec.
9, 1982), available at https://tftptf.com/CLW_Docs/CLW0691.pdf (last visited Aug 9, 2023).
59
Memorandum from Ms. Betz, Quality Control Lab, Envt’l. Section, to Mr. Sharpe, Supervisory Ecologist, Envt’l.
Section (Dec. 21, 1982), available at https://tftptf.com/CLW_Docs/CLW0698.pdf (last visited Aug 9, 2023).
30
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 30 of 45
144. On December 13, 1982, the North Carolina Division of Health Services sent a letter
to Camp Lejeune, reminding of and requesting compliance with an earlier agreement as to annual
water testing, including for Total Organic Halogens.60
145. On February 24-25, 1983, additional samples were taken from all eight water
distribution systems and sent to Grainger.61 In the results analyzed on March 16, 1983, Grainger
noted continued elevated levels of contamination.62
146. On April 14, 1983, LantNavFacEngCom completed an Environmental Engineering
Survey for Camp Lejeune. Despite discussing the total trihalomethane testing which led to the
discovery of the elevated PCE and TCE levels, all mention of these detected contaminants was
omitted from the Survey.63
147. Also in April of 1983, the final draft of the NACIP Initial Assessment Study for
Camp Lejeune was published. The Study omitted discussion of any of the dangerous
contamination that had already been detected at Hadnot Point and Tarawa Terrace, with the only
discussion of TTHM and organic solvent contamination detection being in reference to the Rifle
Range water distribution system.
148. On May 31, 1983, additional samples were taken from all eight water distribution
systems and sent to Grainger. In the results analyzed on June 15, 1983, Grainger noted continued
elevated levels of contamination.64
60
Letter from Gary D. Babb, Geologist, State of N. Carolina to Commanding General, U.S. Marine Corps (Dec. 13,
1982), available at https://tftptf.com/CLW_Docs/CLW3993.pdf (last visited Aug 9, 2023).
61
Trihalomethane Sampling Form (Collected Feb. 24, 1983), available at https://tftptf.com/CLW_Docs/CLW
6393.pdf (last visited Aug 9, 2023).
62
Letter from Bruce A. Babson, Chemist, Grainger Laboratories, to Commanding General, Marine Corps Base
(March 16, 1983), available at https://tftptf.com/CLW_Docs/CLW6393.pdf (last visited Aug 9, 2023).
63
Memorandum from Commander, Atlantic Div. to Commander General Marine Corps Base (Apr. 14, 1983),
available at https://tftptf.com/CLW_Docs/CLW6141.pdf (last visited Aug 9, 2023).
64
Letter from Bruce A. Babson, Laboratory Supervisor, Grainger Laboratories, to Commanding General, Marine
Corps Base (June 15, 1983), available at https://tftptf.com/CLW_Docs/CLW6380.pdf (last visited Aug 9, 2023).
31
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 31 of 45
149. On June 1, 1983, the Facilities Assistant Chief of Staff sent a letter to the North
Carolina Division of Health Services containing information about the water sampling conducted
at Camp Lejeune. Instead of including copies of the original lab reports from Grainger, which
contained repeated warnings about contamination, the letter included only a compiled table of the
data contained in these reports.65
150. On June 21, 1983, the North Carolina Division of Health Services sent a response
letter to the Facilities Assistant Chief of Staff, indicating that the state required the original
analytical data received from Grainger.66 Upon information and belief, this push was because
officials at the North Carolina Division of Health Services had received a tip that the results were
concerning.
151. On July 27, 1983, additional samples were taken from all eight water distribution
systems and sent to Grainger.67 These samples were said to be lost in the mail.68 Upon information
and belief, these samples were not in the typical postal mail, but rather under special shipment, as
they were required to be transported on ice.
152. On August 25, 1983, additional samples were taken from all eight water distribution
systems and sent to Grainger.69 In the results analyzed on August 29, 1983, Grainger noted
continued elevated levels of contamination.70
65
Letter from J.T. Marshall, Colonel, U.S. Marine Corps, to Charles E. Rundgren, Head, Div. of Health Services
(June 1, 1983), available at https://tftptf.com/CLW_Docs/CLW0934.pdf (last visited Aug 9, 2023).
66
Letter from Wm. Larry Elmore, Envt’l. Eng’r, Div. of Health Services, to J.T. Marshall, Colonel, U.S. Marine (June
21, 1982), available at https://tftptf.com/CLW_Docs/CLW0940.pdf (last visited Aug 9, 2023).
67
Trihalomethane Sampling Form (Collected July 27, 1983), available at https://tftptf.com/CLW_Docs/CLW6377.pdf
(last visited Aug 9, 2023).
68
Id.
69
Trihalomethane Info Form (Aug. 25, 1983), available at https://tftptf.com/CLW_Docs/CLW0949.pdf (last visited
Aug 9, 2023).
70
Letter from Bruce A. Babson, Laboratory Supervisor, Grainger Laboratories, to Commanding General, Marine
Corps Base (Aug. 29, 1983), available at https://tftptf.com/CLW_Docs/CLW0952.pdf (last visited Aug 9, 2023).
32
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 32 of 45
153. On December 12, 1983, the Facilities Assistant Chief of Staff sent a response letter
to the North Carolina Division of Health Services, including two additional tables explaining the
compiled results previously provided, but noting that the original analytical data from Grainger
was not included.71 Moreover, this letter stated that voluntary monitoring of most water
distribution systems had been discontinued and requested to reduce sampling at Hadnot Point to
once per year.72
154. On December 30, 1983, additional samples were taken from the Hadnot Point water
distribution system and sent to Grainger. In the results analyzed on January 18, 1984, Grainger
noted continued elevated levels of contamination.
155. On January 20, 1984, the North Carolina Division of Health Services sent a
response letter to the Facilities Assistant Chief of Staff, granting permission to reduce sampling at
Hadnot Point to one sample, once per quarter.73
156. On or about April 1, 1984, one sample was collected from the Hadnot Point water
distribution system and sent to Grainger. In the results analyzed on April 9, 1984, Grainger noted
continued elevated levels of contamination.
157. In July of 1984, the United States collected samples from the Hadnot Point
Industrial Area, including nearby supply well HP-602. Benzene was detected at 380 ppb and DCE
was detected at 46 ppb.
71
Letter from M.G. Lilley, Colonel, U.S. Marine Corps, to Charles E. Rundgren, Div. of Health Services (Dec. 12,
1983), available at https://tftptf.com/CLW_Docs/CLW6348.pdf (last visited Aug 9, 2023).
72
Id.
73
Letter from Charles E. Rundgren, Head, Div. of Health Services, to Colonel M.G. Lilley, U.S. Marine Corps (Jan.
20, 1984), available at https://tftptf.com/CLW_Docs/CLW0977.pdf (last visited Aug 9, 2023).
33
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 33 of 45
158. Also in July of 1984, the United States collected samples from eight wells in the
Tawara Terrace water distribution system. Three of these wells were found to contain
contamination, including TCE.
159. On or about July 1, 1984, one sample was collected from the Hadnot Point water
distribution system and sent to Grainger. In the results analyzed on July 10, 1984, Grainger noted
continued elevated levels of contamination.
160. On November 30, 1984, supply well HP-602 was shut down.74 Despite the
numerous and widespread detections of contamination over more than four years, this was the first
action taken to address the contaminated water supply at Camp Lejeune.
161. On December 3, 1984, supply well HP-602 was sampled again.75 Detected
contaminants included PCE at 24 ppb, TCE at 1,600 ppb, DCE at 630 ppb, and benzene at 121
ppb.76 For decades, the United States insisted that this sample was the reason supply well HP-602
was shut down, but it was later revealed that this sample wasn’t collected until days after HP-602
was shut down on November 30, 1984.
162. Other wells in the Hadnot Point water distribution system were also sampled on the
same day. In the results analyzed on December 6, 1984, TCE contamination was detected in wells
HP-601, HP-603, and HP-608, as well as in the finished water at the Hadnot Point water treatment
plant.77 Supply wells HP-601 and HP-608 were closed at this time.78
74
Memorandum from Utilities Systems General Forman to Director, Utilities Branch (July 27, 1987), available at
https://tftptf.com/CLW_Docs/CLW4971.pdf (last visited Aug 9, 2023).
75
Telephone Conversation Record (Dec. 6, 1984), available at https://www.tftptf.com/CERCLA/00250.pdf (last
visited Aug 9, 2023).
76
Hadnot Point Water Treatment Plant Results (Dec. 4, 1984), available at https://tftptf.com/CLW_Docs/CLW
1054.pdf (last visited Aug 9, 2023).
77
Id.
78
Memorandum from M.P. Bell, Regional Eng’r, Div. of Health Services, to Charles E. Rundgren, Head, Div. of
Health Services (Dec. 11, 1984), available at https://tftptf.com/CLW_Docs/CLW1051.pdf (last visited Aug 9, 2023).
34
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 34 of 45
163. On December 4, 1984, even more samples were collected from supply wells in the
Hadnot Point water distribution system. In the results analyzed on December 10, 1984,
contamination was again confirmed in supply wells HP-601, HP-602, HP-603, and HP-608, and
detected in HP-634, HP-637, and HP-642.
164. On December 10, 1984, Camp Lejeune Base Environmental Engineer Robert
Alexander contacted the State of North Carolina and admitted that volatile organic compounds had
been detected in the Camp Lejeune water supply.79
165. Two days later, on December 12, 1984, Mr. Alexander was quoted in a news article
saying that “every effort will be made to maintain the excellent quality water supply traditionally
provided to residents of Camp Lejeune.”80
166. On December 14, 1984, supply wells HP-634 and HP-637 were shut down.81
167. On January 14, 1985, Environmental Science and Engineering released a NACIP-
related report on the contamination observed at Camp Lejeune.82 However, a number of important
documents contemplated in the schedule appear to be now missing, including the monthly NACIP
progress reports for August through November of 1984, an evaluation of data, and a draft report.
168. On January 25, 1985, samples were collected from Tarawa Terrace supply wells
TT-23 and TT-26. In the results analyzed on February 5, 1985, levels of PCE at 132 ppb, TCE at
5.8 ppb, and DCE at 11 ppb were detected in TT-23, and levels of PCE at 1580 ppb, TCE at 57
ppb, DCE at 92 ppb, and vinyl chloride at 27 ppb were detected in TT-26. Supply well TT-26 was
79
Id.
80
Globe Staff, Camp Lejeune water testing underway, The Globe (Dec. 12, 1984), available at https://www.tftptf
.com/CERCLA/00523.pdf (last visited Aug 9, 2023).
81
Summary of VOC, Chloride, and Flouride Analysis for Hadnot Point and Holcomb Blvd., available at https://tftptf
.com/CLW_Docs/CLW1647.pdf (last visited Aug 9, 2023).
82
Environmental Science and Engineering, Inc., Evaluation of Data from First Round of Verification of Sample
Collection and Analysis (Jan. 14, 1985), available at https://tftptf.com/Misc/Timeline_Linked_March_2012.pdf (last
visited Aug 9, 2023).
35
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 35 of 45
closed at this time. Supply well TT-23 was also closed at this time, but only temporarily. Due to a
recurring water supply shortage in the Tarawa Terrace water distribution system, TT-23 was
reactivated on a number of occasions.
169. On January 27, 1985, a fuel leak was detected at the Holcomb Boulevard water
treatment plant.83 The plant was taken offline, the reservoir was drained, and the bypass valves
between the Hadnot Point and Holcomb Boulevard water distribution systems were activated.84
The Hadnot Point water distribution system provided all water needed for the Holcomb Boulevard
water distribution system until February 4, 1985.85
170. On January 31, 1985, the State of North Carolina collected water samples from the
Holcomb Boulevard water treatment plant to determine whether the fuel leak had been resolved.86
In the results analyzed on February 4, 1985, no fuel product was found, but TCE was detected
throughout the Holcomb Boulevard water distribution system.
171. On February 4, 1985, the Holcomb Boulevard water distribution system was
reactivated, and both the Holcomb Boulevard and Hadnot Point water distribution systems were
flushed.87
172. On the same date, results were received from a January 16, 1985, sample of Hadnot
Point supply wells.88 HP-651 was identified as having high levels of contaminants, including PCE
at 386 ppb, TCE at 3,200 ppb, DCE at 3,400 ppb, and vinyl chloride at 655 ppb.89 Supply well HP-
83
Operator Log (Jan. 27, 1985), available at https://tftptf.com/CLW_Docs/CLW4514.pdf (last visited Aug 9, 2023).
84
Chronology (Feb. 26, 1985), available at https://tftptf.com/CLW_Docs/CLW4546.pdf (last visited Aug 9, 2023).
85
Id.
86
Operator Log (Jan. 27, 1985), available at https://tftptf.com/CLW_Docs/CLW4514.pdf (last visited Aug 9, 2023).
87
Chronology (Feb. 26, 1985), available at https://tftptf.com/CLW_Docs/CLW4546.pdf (last visited Aug 9, 2023).
88
Report #17 Laboratory Analysis on Naval Samples (Feb. 6, 1985), available at https://tftptf.com/CLW_Docs/CLW
5594.pdf (last visited Aug 9, 2023).
89
Id.
36
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 36 of 45
651 was closed at this time.90 Supply wells HP-652 and HP-653 also showed contamination in
these results, although at much lower levels, and were closed on February 8, 1985.91
173. On February 7, 1985, finished water at the Berkeley Manor Elementary School,
serviced by the Holcomb Boulevard water distribution system, continued to test at 135.1 ppb of
TCE.92
174. On February 8, 1985, supply wells HP-652 and HP-653 were shut down.93
175. On February 22, 1985, after closing all of the supply wells noted above, finished
water from the Hadnot Point water treatment plant tested at 1 ppb of TCE.94
176. On March 1, 1985, the Facilities Assistant Chief of Staff provided an action brief
discussing potential solutions to an anticipated water shortage at Tarawa Terrace, due to the closure
of supply wells TT-23 and TT-26. One option presented was to build a water line to draw water
from another water distribution system; this option was selected but was not implemented until
years later. Another option was to re-activate wells known to be contaminated when needed to
maintain supply, because “the potential health hazards must be weighed against the need and cost
of providing water from other sources.”95
177. On March 8, 1985, supply well HP-651 was retested, yielding high contamination
levels, including 400 ppb of PCE, 18,900 ppb of TCE, 7,580 ppb of DCE, and 168 ppb of vinyl
chloride.96
90
Chronology (Feb. 26, 1985), available at https://tftptf.com/CLW_Docs/CLW4546.pdf (last visited Aug 9, 2023).
91
Id.
92
Analysis Report (Feb. 7, 1985), available at https://tftptf.com/CLW_Docs/CLW5369.pdf (last visited Aug 9, 2023).
93
Well History (Feb. 8, 1985), available at https://tftptf.com/CLW_Docs/CLW5095.pdf (last visited Aug 9, 2023).
94
G C Report Sheet (Feb. 22, 1985), available at https://tftptf.com/CLW_Docs/CLW4533.pdf (last visited Aug 9,
2023).
95
Action Brief from M.G. Lilley (Mar. 1, 1985), available at https://tftptf.com/CLW_Docs/CLW1129.pdf (last visited
Aug 9, 2023).
96
Volatile Organic Chemical Analysis Reports (Mar. 8, 1985), available at https://tftptf.com/Misc/Timeline_Linked
_March_2012.pdf (last visited Aug 9, 2023).
37
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 37 of 45
178. On March 21, 1985, a meeting was held to discuss the options to address the water
shortage at Tarawa Terrace. Because the use of water from the contaminated wells was deemed to
not pose an “extreme health threat” to recipients of the contaminated water, as-needed use of the
contaminated water was approved.97
179. In September of 1985, supply well TT-25 was found to be contaminated with PCE.
180. On November 19, 1985, the water at the Hadnot Point water treatment plant was
found to contain 2,500 ppb of benzene.98 This is 500 times the level of benzene exposure permitted
by the EPA’s current MCLs. In the results summary of this sample, a handwritten note dismissed
this finding as “not representative”.99
181. On December 10, 1985, the water at the Hadnot Point water treatment plant was
still found to contain 38 ppb of benzene.100
182. On January 13, 1987, Hadnot Point supply well HP-645 was shut down due to
benzene contamination. Despite the numerous detections of benzene, benzene contamination was
dismissed on the grounds of quality control errors. This contamination was discounted and not
properly investigated, despite later revelations that there was a significant fuel leakage at the fuel
farm.
183. On January 14, 1987, Tarawa Terrace supply well TT-25 was closed.
184. After the first detection of water contamination in October of 1980, it took more
than six years for the United States to identify, acknowledge, and address the poisonous water
supply at Camp Lejeune.
97
Meeting Notes: Volatile Organic Chemicals (VOC) in the Camp Lejeune Water Supply (Mar. 21, 1985), available
at https://tftptf.com/CLW_Docs/CLW6596.pdf (last visited Aug 9, 2023).
98
Memorandum from Director, Natural Resources and Environmental Affairs Division, to Environmental Engineer,
Facilities Department (Jan. 24, 1986), available at https://tftptf.com/CLW_Docs/CLW1406.pdf (last visited Aug 9,
2023).
99
Id.
100
Id.
38
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 38 of 45
185. Over the years and decades that followed, there have been a number of significant
studies conducted to identify the massive, life-changing, and widespread harm caused by this
contaminated water. These studies were hindered for years by the United States withholding
information.
186. By 1994, the ATSDR was writing letters to the Marine Corps complaining of a lack
of cooperation and access to important records for researching the extent of contamination and
health impacts.
187. In 1997, on behalf of the United States, the ATSDR published a public health
assessment on the water contamination at Camp Lejeune. In 2009, the ATSDR retracted this public
health assessment, due in large part to hidden information coming to light. This was the first time
in the history of the ATSDR that a public health assessment was retracted.
188. In 2007, the Government Accountability Office issued a report reviewing the
ATSDR’s attempt to study the contamination. This report is recognized to be flawed because it
evaluated the 1997 ATSDR public health assessment which was later retracted, and thus did not
include the new information leading to the retraction.
189. In 2009, the National Research Council published a report on the water
contamination at Camp Lejeune. This report was structured by the Navy and has been widely
criticized as overlooking key data and having significant gaps in reasoning.
190. Also in 2009, ATSDR staff gained access to a previously undisclosed electronic
database containing more than 700,000 pages of Navy and Marine Corps documents about
contamination at Camp Lejeune. Among these documents, the ATSDR found information
documenting that as much as 1.1 million gallons of fuel were lost into the ground at Hadnot Point.
Prior to this information being learned, the United States had insisted that no more than 50,000
39
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 39 of 45
gallons had been lost. This newly found data was a major factor leading to the retraction of the
ATSDR’s 1997 public health assessment.
191. The U.S. House of Representatives Committee on Science and Technology,
Subcommittee on Investigations and Oversight, recognized that “[i]t is difficult to provide clear
scientific analyses when you cannot be certain that the records you are relying on for that analysis
are complete.”101
192. For at least three of the contaminants at issue, there are actual measurements of
contamination levels that are even more elevated than the highest projected measurements of the
reconstructed models contained in ATSDR reports.102
193. Because key information was withheld from early investigators, which led to
crucial delays, or was otherwise withheld, lost, or destroyed over time, the full extent of
contamination at Camp Lejeune may be even greater than what studies to date have identified.
194. Plaintiffs reserve the right to seek a spoliation instruction.
101
H.R. Rep. No. 111-108 (2010), at 6, available at https://www.govinfo.gov/content/pkg/CHRG-111hhrg58485/pdf/
CHRG-111hhrg58485.pdf (last visited Aug. 9, 2023).
102
Compare Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for Disease Control and Prevention,
Dep’t of Health and Hum. Servs., Chemicals at Camp Lejeune (FAQs), https://www.atsdr.cdc.gov/
sites/lejeune/faq_chemicals.html (last visited Jun. 27, 2023) (“The maximum level [of PCE] detected in
drinking water was 215 parts per billion…”) with ATSDR Reconstruction App’x A2 at A92, available at
https://www.atsdr.cdc.gov/sites/lejeune/docs/Reconstructed%20TTWTP%20Concentrations_ATSDR_Chapter%20
A%20Report_Camp%20Lejeune.pdf (last visited Jun. 27, 2023) (highest simulated PCE level in Tarawa Terrace
finished water was 182.13 ppb); compare Agency for Toxic Substances and Disease Registry (ATSDR), Ctrs. for
Disease Control and Prevention, Dep’t of Health and Hum. Servs., Chemicals at Camp Lejeune (FAQs),
https://www.atsdr.cdc.gov/sites/lejeune/faq_chemicals.html (last visited Jun. 27, 2023) (“The maximum level [of
TCE] detected in drinking water was 1,400 [ppb]…”) with ATSDR Reconstruction App’x A7 at A168, available at
https://www.atsdr.cdc.gov/sites/lejeune/docs/Reconstructed%20HPWTP%20Concentrations_ATSDR_Chapter%20
A%20Report_Camp%20Lejeune.pdf (last visited Jun. 27, 2023) (highest simulated TCE level in Hadnot Point
finished water was 783 ppb); compare H.R. Rep. No. 111-108 (Sept. 16, 2010), at 35, available at
https://www.govinfo.gov/content/pkg/CHRG-111hhrg58485/pdf/CHRG-111hhrg58485.pdf (last visited Jun. 27,
2023). (“...the treated water at the Hadnot Point [water treatment plant] was sampled and found to contain benzene in
the extreme amount of 2,500 ppb.”) with ATSDR Reconstruction App’x A7 at A168, available at
https://www.atsdr.cdc.gov/sites/lejeune/docs/Reconstructed%20HPWTP%20Concentrations_ATSDR_Chapter%20
A%20Report_Camp%20Lejeune.pdf (last visited Jun. 27, 2023) (highest simulated benzene level in Hadnot Point
finished water was 12 ppb).
40
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 40 of 45
B. PLAINTIFFS’ INJURIES
195. During the relevant time period, Plaintiffs used water from the Hadnot Point water
distribution system, the Holcomb Boulevard water distribution system, the Tarawa Terrace water
distribution system, and/or the Camp Johnson water distribution system, exposing Plaintiffs to
unsafe amounts of contaminated water.
196. During the relevant time period, many Plaintiffs used water from water buffaloes
which were filled with water from the Hadnot Point water distribution system and/or other
contaminated sources, exposing Plaintiffs to unsafe amounts of contaminated water.
197. The above conduct caused the Plaintiffs to sustain personal injuries or death, as
more particularly alleged in Plaintiffs’ Short Form Complaints.
198. At the current time, the Unites States has conceded that exposure to the
contaminated water at Camp Lejeune meets an equipoise or greater standard for certain diseases,
including but not limited to kidney cancer, liver cancer, bladder cancer, non-Hodgkin’s lymphoma,
multiple myeloma, acute lymphocytic leukemia, chronic lymphocytic leukemia, chronic myeloid
leukemia, other forms of leukemia, Parkinson’s disease, end-stage renal disease, scleroderma,
systemic sclerosis, cardiac birth defect, aplastic anemia, and myelodysplastic syndrome.103
199. Upon information and belief, during the relevant time period, in addition to the
specific contaminants alleged above, there have been one or more additional contaminants in the
water at Camp Lejeune that have not yet been studied, are being studied, or have not yet been made
publicly available but that are believed to be the cause of additional medical and/or psychological
conditions and/or diseases of Plaintiffs.
103
See generally ATSDR Evidence Assessment.
41
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 41 of 45
200. Moreover, there is ample scientific evidence as of today demonstrating that
exposure to the contaminated water at Camp Lejeune meets an equipoise or greater standard of
causation for other cancers and non-cancer diseases. Upon information and belief, additional
studies are also underway that are reviewing the causal link between the contaminants at Camp
Lejeune and other conditions and/or diseases.
201. There is a sufficient causal link between Plaintiffs’ injuries and the toxic water
Plaintiffs were exposed to at or from Camp Lejeune.
202. As a direct and proximate result of Plaintiffs’ exposure to toxic water at or from
Camp Lejeune, Plaintiffs have been forced to endure significant physical and mental pain and
suffering and to undergo significant and extensive medical treatment, and in some instances caused
their death.
203. Further, as a result of Plaintiffs’ exposure to toxic water at or from Camp Lejeune,
Plaintiffs have suffered other damages. These damages include, but are not limited to: medical
expenses, medication expenses, medical supply expenses, transportation expenses related to
medical treatment, food expenses related to medical treatment, lost income, and other damages as
further detailed in each Plaintiff’s Short Form Complaint.
VI. COUNT 1: RELIEF UNDER THE CAMP LEJEUNE JUSTICE ACT
204. Plaintiffs incorporate by reference each of the allegations 1 through 203 above.
205. The CLJA provides that:
An individual, including a veteran (as defined in section 101 of title 38, United
States Code), or the legal representative of such an individual, who resided, worked,
or was otherwise exposed (including in utero exposure) for not less than 30 days
during the period beginning on August 1, 1953, and ending on December 31, 1987,
to water at Camp Lejeune, North Carolina, that was supplied by, or on behalf of,
the United States may bring an action in the United States District Court for the
Eastern District of North Carolina to obtain appropriate relief for harm that was
caused by exposure to the water at Camp Lejeune.
42
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 42 of 45
206. Plaintiffs were on the Marine Corps base at Camp Lejeune sometime during the
period between August 1, 1953, and December 31, 1987, and were exposed to the contaminated
water at or from Camp Lejeune.
207. Each Plaintiff’s exposure to water at or from Camp Lejeune totaled not less than 30
days between August 1, 1953, and December 31, 1987.
208. The water Plaintiffs were exposed to at or from Camp Lejeune during this time was
supplied by, or on behalf of, Defendant United States.
209. The water Plaintiffs were exposed to at or from Camp Lejeune was polluted and
contaminated with chemicals and volatile organic compounds including but not limited to PCE,
TCE, DCE, vinyl chloride, and benzene.
210. As a result of Plaintiffs’ exposure to polluted and contaminated water at or from
Camp Lejeune, Plaintiffs suffered and will continue to suffer serious harm or Plaintiffs have died.
211. This harm was caused by exposure to the water at or from Camp Lejeune.
212. There is ample scientific evidence demonstrating that exposure to the contaminated
water at or from Camp Lejeune meets an equipoise or greater standard of causation for Plaintiffs’
injuries or death.
213. Plaintiffs have filed administrative claims with the Navy addressing the issues
raised in their Short Form Complaints. Plaintiffs’ administrative claims have either (a) received a
final denial or (b) been deemed a final denial because six months have passed since the claims
were filed with the Navy and they remain without a final disposition.
214. Under the CLJA, Plaintiffs suffered harm or death as a result of exposure to the
water at or from Camp Lejeune and are entitled to appropriate relief.
43
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 43 of 45
VII. CLAIM FOR RELIEF
Plaintiffs respectfully request that the Court enter judgment against the United States under
the CLJA and award damages and all other appropriate relief for the harm that they have endured
as a result of exposure to contaminated and unsafe water at or from Camp Lejeune, including but
not limited to personal injuries or death, along with all related costs and damages.
VIII. JURY TRIAL DEMAND
Pursuant to Fed. R. Civ. P. 38 and CLJA § 804(d), Plaintiffs demand a trial by jury.
Dated: October 6, 2023
Respectfully submitted,
/s/ J. Edward Bell, III /s/ Zina Bash
J. Edward Bell, III (admitted pro hac vice) Zina Bash (admitted pro hac vice)
Bell Legal Group, LLC Keller Postman LLC
219 Ridge St. 111 Congress Avenue, Suite 500
Georgetown, SC 29440 Austin, TX 78701
Telephone: (843) 546-2408 Telephone: 956-345-9462
jeb@belllegalgroup.com zina.bash@kellerpostman.com
Lead Counsel for Plaintiffs Co-Lead Counsel for Plaintiffs and
Government Liaison Counsel
/s/ Elizabeth J. Cabraser /s/ W. Michael Dowling
Elizabeth J. Cabraser (admitted pro hac vice) W. Michael Dowling (NC Bar No. 42790)
Lieff Cabraser Heimann & Bernstein, LLP The Dowling Firm PLLC
275 Battery Street, 29th Floor Post Office Box 27843
San Francisco, CA 94111 Raleigh, North Carolina 27611
Telephone: (415) 956-1000 Telephone: (919) 529-3351
ecabraser@lchb.com mike@dowlingfirm.com
Co-Lead Counsel for Plaintiffs Co-Lead Counsel for Plaintiffs
44
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 44 of 45
/s/ Robin L. Greenwald /s/ James A. Roberts, III
Robin L. Greenwald (admitted pro hac vice) James A. Roberts, III (N.C. Bar No.: 10495)
Weitz & Luxenberg, P.C. Lewis & Roberts, PLLC
700 Broadway 3700 Glenwood Avenue, Suite 410
New York, NY 10003 P. O. Box 17529
Telephone: 212-558-5802 Raleigh, NC 27619-7529
rgreenwald@weitzlux.com Telephone: (919) 981-0191
jar@lewis-roberts.com
Co-Lead Counsel for Plaintiffs
Co-Lead Counsel for Plaintiffs
/s/ Mona Lisa Wallace
Mona Lisa Wallace (N.C. Bar No.: 009021)
Wallace & Graham, P.A.
525 North Main Street
Salisbury, North Carolina 28144
Tel: 704-633-5244
mwallace@wallacegraham.com
Co-Lead Counsel for Plaintiffs
/s/ Hugh R. Overholt /s/ A. Charles Ellis
Hugh R. Overholt (NC Bar No. 016301) A. Charles Ellis (N.C. Bar No.: 010865)
Ward and Smith P.A. Ward and Smith P.A.
Post Office Box 867 Post Office Box 8088
New Bern, NC 28563-0867 Greenville, NC 27835-8088
Telephone: (252) 672-5400 Telephone: (252) 215-4000
hro@wardandsmith.com ace@wardandsmith.com
Liaison Counsel Liaison Counsel
45
Case 7:23-cv-00897-RJ Document 25 Filed 10/06/23 Page 45 of 45
Newsletter
Sign up to receive the Free Law Project newsletter with tips and announcements.